KOREA GAS TECHNOLOGY CORPORATION
Projects
KUWAIT Al-Zour LNG Terminal Project Commissioning Service
Business Outline: Commissioning for LNG Terminal(Mechanical, Electrical, Instrument, DCS and Operation)
Location: AI-Zour, Kuwait
Client: KIPIC
Contractor: KOGAS
Business Type: E.P.C.
Facilities: 8 units of 225,500㎘ LNG Storage Tanks, LNG Processing capacity 2700ton/hr
Project period : Nov.2019 ~ Apr. 20201
KOGAS-Tech Scope: Commissioining and Training
Indonesia Tanjung Sekong LPG Terminal Project Commissioning Service
Business Outline: Commissioning for LPG Terminal(Mechanical, Electrical, Instrument, DCS and Operation)
Location: Tanjung Sekong, Indonesia
Client: Pertamina
Contractor: POSCO E&C
Business Type: E.P.C.
Facilities: 2 units of 44,000tons C3, C4 Tanks
Project period : Sep.2019 ~ Feb. 2020
KOGAS-Tech Scope: Commissioning, Technical Support
KUWAIT Al-Zour LNG Terminal Project Maintanance Manual Documentation
Business Outline: Maintanance Manual Documentation of LNG Terminal
Client: KIPIC
Contractor: KOGAS
Project period : '18.6 ~ '21.2
KOGAS-Tech Scope: Maintanance Manual Documentation in English
DUNKERQUE LNG Terminal O&M Feasible Study
Business Outline: O&M Feasible Study for LNG Terminal investment
Client: IPM KOREA
Project period : '18.7 ~ '18.8
KOGAS-Tech Scope: Feasible Study and Consulting for LNG Terminal O&M
PANAMA COSTA NORTE LNG TERMINAL PJT Commissioning Services
Business Outline: O&M Training and Manual documentation, Pre-commissioning Support and Commissioning for LNG Terminal
Location: Colon, Panama
Client: AES Panama
Contractor: POSCO E&C
Business Type: E.P.C
Facilities: 1 unit of 180,000㎘ LNG Storage Tank, LNG Processing capacity 8.5~51Ton/hr
Project period : '17.7 ~ '19.11
KOGAS-Tech Scope: O&M Training, O&M Manual documentation, Pre-commissioning Support, Commissioning and Operation Support
Singapore SLNG Phase#3 LNG Terminal Project
Business Outline: Commissioning on the gauges and operation for LNG terminal
Location: Jurong Island, Singapore
Client: Singapore LNG Corporation Pte Ltd
Contractor: Samsung C&T
Business Type: E.P.C
Facilities: 9MMTPA(Phase 1 4.5MMTPA), 1 unit of 280,000㎘ LNG storage tank
Project period : Oct. 2016 ~ Nov. 2017
KOGAS-Tech Scope: Commissioning, Technical support
Thailand PTT LPG Terminal Project
Business Outline: Commissioning on the machines, gauges and operation for LPG terminal
Location: Khao Bo Ya, 80km southeast of Bangkok, Thailand
Client: Thailand PTT Public Company Limited
Contractor: Samsung C&T
Business Type: E.P.C
Facilities: 2 units of 25,000ton C3, C4 storage tanks
Project period : Jul. 2016 ~ Nov. 2017
KOGAS-Tech Scope: Commissioning, Technical support
Sinopec Guangxi LNG Terminal Project
Business Outline: Commissioning and technical consulting on the machines, gauges, electric control, gauge control and operation for LNG terminal
Location: Beihai, Guangxi Zhuangzu, China
Client: SINOPEC Beihai LNG
Contractor: KOGAS
Business Type: E.P.C
Facilities: 4 units of 160,000㎘ LNG storage tanks(Annual processing capacity 3 million tons)
Project period : Jan. 2016 ~ Jun. 2016
KOGAS-Tech Scope: Commissioning, Technical consulting
Saudi Arabia Hout Onshore Gas Facility Project
Business Outline: Onshore Gas Facility EPC Project for gas collection, compression, dehydration and supply from offshore platform of Hout Crude Handling Facilities and existing onshore Hout Crude Facilities located in Al-Khafji, Saudi Arabia.
Location: Khafji industrial complex, Saudi Arabia
Client: Khafji Joint Operation
Contractor: DAEWOO E&C
Business Type: E.P.C
Facilities: 3 units of 160,000㎘ storage tanks(Annual processing capacity 3 million tons)
Project period: Oct. 2015~Sep. 2016
KOGAS-Tech Scope: Construction Support and Technical Consulting for Commissioning
LNG terminal Commissioning and Technical Consulting Service in Qingdao, China
Business Outline: Commissioning and technical consulting on the machines, gauges, electric control and gauge control for LNG terminal
Location: Jiaonan Shi, Qingdao, Shandong, China
Client: SINOPEC Qingdao LNG
Contractor: KOGAS
Business Type: E.P.C
Facilities: 3 units of 160,000㎘ LNG storage tanks. Annual processing capacity 3 million tons
Project period : June. 2014 ~ April. 2015
KOGAS-Tech Scope: Commissioning, O&M technical consulting
Commissioning for West Qurna II, Iraq
Business Outline: EPC project to build CPF, water-intake, tank farm, pipeline, etc. on a site of approx. 2.3㎢ area in Basrah, Iraq.
Location: West Qurna 2 site, 65km west of Basrah, Iraq
Client: LUKOIL
Contractor: Samsung Engineering
Business Type: E.P.C
Facilities: CPF(Train x 9, Well x 67), Water-intake, Tank Farm(60,000 barrel x 3)
Project period: Nov. 2013~Jun. 2015
KOGAS-Tech Scope: Commissioning
LNG terminal project in Manzanillo, Mexico
Business Outline: Building and operating LNG terminal to supply power and industrial natural gas to mid-western area of Mexico
Location: Manzanillo, Colima state West Pacific coast, Mexico
Client: CFE
Business Type: Build-Own-Operate(BOO)
Partners: KOGAS(25%), Samsung C&T(37.5%), Mitsui(37.5%)
Facilities: 150,000㎘ storage tank x 2, facilities for vaporizing and transfer(Annual processing capacity 3.8 million tons)
Project period: Apr. 2008~Aug. 2031(Construction: Apr. 2008~Aug. 2011. Operation: Sep. 2011~Aug. 2031)
KOGAS-Tech Scope: Maintenance, prevention inspection for liquefied natural gas process and utility facilities
Thailand PTT LNG terminal project
Business Outline: Building the Thailand's first LNG terminal in Rayong, Thailand
Client: PTTLNG Company Limited
Consortium: KOGAS, GS E&C, Daewoo Engineering
Partners: KOGAS(25%), Samsung C&T(37.5%), Mitsui(37.5%)
Facilities: 160,000㎘ storage tank x 2, facilities for vaporizing and transfer(Annual processing capacity 5 million tons)
Project period: Jun. 2010~Aug. 2011
KOGAS-Tech Scope: Commissioning
Singapore LNG terminal project
Business Outline: Building the Singapore's first LNG terminal in Jurong, Singapore
Client: Singapore LNG Pte. Ltd.
Contractor: Samsung C&T
Facilities: 180,000㎘ storage tank x 2, facilities for vaporizing and transfer(Annual processing capacity 3.5 million tons)
Project period: Mar. 2010~Aug. 2013
KOGAS-Tech Scope: Commissioning, CMA
LNG terminal technical consulting project in Zhejiang, China
Business Outline: Technical consulting for LNG terminal located in Zhejiang, China
Client: CNOOC-Zhejiang LNG Co., Ltd.
Facilities: 160,000㎘ storage tank x 3, facilities for vaporizing and transfer(Annual processing capacity 3 million tons)
Project period: Jul. 2012~Dec. 2012
KOGAS-Tech Scope: Technical consulting
LNG terminal project in Nigeria and Qatar
Nigerian CCAGG(Cawthorne Channel Associated Gas Gathering) project Commissioning (2002~2006)
Commissioning for QP(Qatar Petroleum) LPG base(2003~2005), Qatar
Commissioning, training and supervising(2008~2011) for Gbaran Ubie IOGP(Integrated Oil & Gas Project), Nigeria